McGregor Park Arena

Rooftop of arena showing solar module racking installationStreet view of arena showing solar module racking installation on rooftopStreet view of McGregor Arena rooftop before solar array
Client: 
Toronto Hydro
Capacity (kW): 
75
Locations: 
Toronto , ON
Commercial Operation: 
2012

Carmanah will engineer and construct three rooftop solar photovoltaic (PV) generating facilities in the fall of 2012. The systems are located on York Mills, McGregor and Mimico Arenas and are expected to produce more than 250,000 kWh of clean, renewable energy annually for the City of Toronto.

The variety of roof materials on these particular host facilities comprised of corrugated steel, standing seam and modified bitumen, required Carmanah to conduct a comprehensive onsite structural review and roofing upgrades for two of the three buildings. Carmanah worked closely with Pyramids Engineering to perform the structural analysis and Foran's roofing to perform the roof repair work. 

Module Manufacturer: 
Eclipsall
Solar Racking: 
Schletter Canada Inc.
Inverter Manufacturer: 
Advanced Energy

 


Bring on the Sun: Solar Program Launches Today

Jim Baxter, City of Toronto, Councillor Michael Thompson (Ward 37) and Jack Simpson, Toronto Hydro at McGregor Park Arena in Scarborough at the official launch of a joint program between the City of Toronto and Toronto Hydro.  it will see 10 city-owned buildings outfitted with more than 8,800 solar panels. (CNW Group/Toronto Hydro Corp).

Read more.